nCa Report Mary State Electric Station, 8 September 2018 – Ashgabat 9 September 2018 (nCa) — The power generation capacity of Turkmenistan increased by about 30% on Saturday when a combined cycle power plant was put into operation at the Mary State Electric (Station MaryGres). President Berdymuhamedov led the opening ceremony. The powerhouse, built by […]
Home » GE